Beginning at 7pm tonight there will lane closures on Route 8 throughout the summer for bridge replacements near exit 4. The bridges have been prefabricated on the side of highway and are ready to be put in place. This will reduce the construction time from 2 years to one summer. There numerous phases of the construction so visit http://rt8bridgeport.com/ . Two construction cameras have been installed and can be viewed here: http://rt8bridgeport.com/livefeed/